Modular elevator
We apply the MiC integrated building technology to split an elevator into MiC modules. 
The elevator shafts, circuit pipelines, elevator components (such as guide rails, counterweight frames, elevator doors),
and exterior walls are installed in an integrated manner in the factory. After the prefabricated elevator pit is installed on site,
the MiC modules of the elevator are lifted and installed and pipelines are connected to quickly put the elevator into use. 
It not only improves the installation efficiency, but only reduces on-site noise and solid
waste during the construction, providing users with a more comfortable installation and use experience.
Shenzhen Middle School (Nigang Campus) elevator installation project
  • Intelligent O&M
  • Digital construction
  • Industrial production
  • Modular design
Build Smart
enjoy the convenience of technology

The elevator installation project of Shenzhen Middle School (Nigang Campus) installs eight 1.6T elevators for four student dormitories (two elevators for each building), with a floor area of about 2,100 m2. The project adopts the MiC integrated building technology and uses 108 E-MiC modules of seven types for high-rise elevators.

The project has been put into operation after being completed and accepted on June 30, 2022. It took just 66 days from foundation construction to delivery. The project is a pilot project for new building industrialization in Shenzhen, which is the first high-rise dual-car elevator product adopting MiC technology in China.

Smart O&M

The elevators are equipped with elevator sentries, built-in car data acquisition devices, safety circuit sensors, and car emergency recognition modules. Real-time monitoring is performed for the safe operation of elevators. They are connected to Shenzhen's "Smart City" regulatory platform according to Shenzhen's "Integrated Network Management" strategy.

Natural appearance

On-site construction errors can be quickly, directly, and accurately collected using laser scanning and BIM technology. Through BIM-powered design, factory adjustments can be made to ensure on-site construction accuracy and blend an elevator with the exterior facade of a building.

Operational Energy Efficiency

With an electrical energy feedback device in the elevator room, the project effectively recycles electrical energy back to the elevator power grid, with a recycling rate of about 20%.

Project Cases
  • Elevator Installation Project for
    Shenzhen Middle School Nigang Campus

    The project includes eight 1.6T elevators installed to the four student dormitories, using a total of 108 MiC module units. It took just 66 days from the construction of foundation to final delivery. We have independently developed a high-precision positioning system, which controls the manufacturing accuracy of shaft modules to millimeters.

    It is a pilot project for the industrialization of new buildings in Shenzhen, and is also one of the first high-rise building products in China adopting dual-cabin shaft MiC technology.

  • Huawei Gang Tou Talent
    Apartment Installation Elevator Project

    A total of 11 elevators were installed, with 30 stopping floors and a total height of 105.4 m. 32 modules were used, including two modules for the top floor, one for each of other floors, and one for the elevator room.