Modular school

  • Rapid construction
    Constructed in multiple months for enrollment in the same year
  • Removable and reusable
    Patented detachable steel-structural modules
  • Environmental-friendly materials
    Educed harmful gas emissions and excellent sound
    insulation and noise reduction effects
Project Cases
  • Shenzhen Futian Kindergarten

    With a total construction area of 22,000 m2, we completed the construction of eight kindergartens in just three months, halving the construction period. A total of 421 MiC modules were used.

    They are China's first MiC kindergartens and a prefabricated pilot project in Shenzhen.

  • Futian Second Experimental School

    The actual construction period of the project is approximately 100 days. The school covers a total construction area of approximately 5,656 m2, consisting of 137 MiC module units. It is designed to accommodate 18 classes and 810 primary school students.

    Flexible dismantling, remote construction, and reusable

  • Prefabricated School EPC Project
    in Changzhen

    The project covers a total construction area of 25,363.62 m2, including sports fields and supporting facilities and is designed for 42 primary school classes and 12 kindergarten classes. It can accommodate 1,890 primary school students and 360 kindergarten students.。

    A total of 338 MiC modules are used, with a scheduled construction period of 259 calendar days.

  • Future Science and Technology Innovation
    Center School Project in Guangde

    The project is located in Guangde Economic Development Zone, Xuancheng, Anhui Province. The planned construction covers a school with 24 primary school classes and 24 junior high school classes, with a total construction area of 45,752.26 m2.

    It is designed to accommodate 2,280 full-time students (1,080 in primary school and 1,200 in junior high school).